Digital Monument Signs in Oshkosh are planned around the parcel's governing municipality and the traffic on roads such as STH 21 (about 22,600 vehicles per day). Projects in Oshkosh are coordinated from our Kaukauna project office, about 22 miles away. This page does not represent a separate local office.
Oshkosh's strongest sign visibility comes from STH 21 west of the Fox River and the Main Street, 9th Avenue and 20th Avenue corridors, each with very different speeds and setbacks.
Digital Monument Signs: local rules in Oshkosh
- Oshkosh regulates signs in Chapter 30 (Zoning Ordinance), Article X Signage. Planning Services publishes a sign, canopy and awning requirements summary that is the practical starting point before drawings are prepared.
- The Town of Oshkosh, north of the city, is a separate jurisdiction with its own sign regulations (Title 16, Chapter 7). A mailing address that says “Oshkosh” does not always mean the city reviews the sign.
Traffic on Oshkosh commercial corridors
| WisDOT count location | Vehicles per day (AADT) | Count year | Road class |
|---|---|---|---|
| STH 21 between I-41 & N Koeller St | 22,600 | 2026 | Principal arterial |
| 20th Ave east of STH 44 Park St Oshkosh | 13,200 | 2026 | Principal arterial |
| W 9th between Mason St & Hawthorn St Oshkosh | 12,900 | 2026 | Principal arterial |
Use the Wisconsin traffic count tool to check the segment in front of a specific property. The nearest count is not automatically the correct road segment.
Sizing digital monument signs for Oshkosh
Monument signs are read at lower heights and shorter distances, so a 6–10 mm pitch is typical. The electronic area must fit within the sign's allowed face area, and many codes require it to be integrated into a ground sign rather than added as a separate cabinet.
Questions for the site review
- What masonry, cabinet or tenant-panel elements must be retained?
- How much of the sign face may be electronic?
- What foundation and setback constraints apply?
- Does the site need visibility from one direction or both?
- Which municipality governs the parcel: Oshkosh or one of Town of Oshkosh, Town of Algoma, Omro?
Official starting point: City of Oshkosh planning application brochures. Compare with the statewide Digital Monument Signs page and the Oshkosh service-area page.
Frequently asked questions
Can I add an LED display to an existing monument sign in Oshkosh?
Often yes, if the existing base and cabinet can carry the display and the electronic area fits the face area Oshkosh's code allows. Reusing masonry can lower cost, but the structure, power and setback still need to be checked during the site review.
How long must a digital sign message stay on screen in Oshkosh?
Oshkosh sets electronic sign rules in its own code (linked on this page). Many Wisconsin municipalities use 6–8 second minimum hold times. Confirm the current requirement for the exact parcel.
Which municipality reviews my sign permit?
The municipality that governs the parcel, not the mailing address. Around Oshkosh, nearby jurisdictions include Town of Oshkosh, Town of Algoma, Omro, Winneconne, and each administers its own sign approvals.