Digital Monument Signs in Green Bay are planned around the parcel's governing municipality and the traffic on roads such as STH 54 Bridge over Fox River - Mason St (about 35,400 vehicles per day). Projects in Green Bay are coordinated from our Kaukauna project office, about 21 miles away. This page does not represent a separate local office.
Green Bay's highest-traffic surface corridors, including Mason Street, Main Street, Lombardi Avenue and Oneida Street, split across the city and its neighboring villages.
Digital Monument Signs: local rules in Green Bay
- The City of Green Bay states that signs require Planning review. Its sign permit application asks for a scaled site plan, existing-sign information and, for illuminated signs, the electrical contractor. Zoning rules are published on the city's Codes & Ordinances page.
- Several corridors that read as “Green Bay” are in other municipalities: Oneida Street near Pilgrim Way is in Ashwaubenon, Monroe Road (CTH GV) north of STH 172 is in Bellevue, and Webster Avenue north of Greene is in Allouez. Each applies its own sign rules.
Traffic on Green Bay commercial corridors
| WisDOT count location | Vehicles per day (AADT) | Count year | Road class |
|---|---|---|---|
| STH 54 Bridge over Fox River - Mason St | 35,400 | 2025 | Principal arterial |
| Mason St between Webster & STH 57 Green Bay | 29,900 | 2025 | Principal arterial |
| CTH GV Monroe north of STH 172 Bellevue | 29,700 | 2025 | Minor Arterial |
Use the Wisconsin traffic count tool to check the segment in front of a specific property. The nearest count is not automatically the correct road segment.
Sizing digital monument signs for Green Bay
Monument signs are read at lower heights and shorter distances, so a 6–10 mm pitch is typical. The electronic area must fit within the sign's allowed face area, and many codes require it to be integrated into a ground sign rather than added as a separate cabinet.
Questions for the site review
- What masonry, cabinet or tenant-panel elements must be retained?
- How much of the sign face may be electronic?
- What foundation and setback constraints apply?
- Does the site need visibility from one direction or both?
- Which municipality governs the parcel: Green Bay or one of Ashwaubenon, Allouez, Bellevue?
Official starting point: City of Green Bay sign-permit application. Compare with the statewide Digital Monument Signs page and the Green Bay service-area page.
Frequently asked questions
Can I add an LED display to an existing monument sign in Green Bay?
Often yes, if the existing base and cabinet can carry the display and the electronic area fits the face area Green Bay's code allows. Reusing masonry can lower cost, but the structure, power and setback still need to be checked during the site review.
How long must a digital sign message stay on screen in Green Bay?
Green Bay sets electronic sign rules in its own code (linked on this page). Many Wisconsin municipalities use 6–8 second minimum hold times. Confirm the current requirement for the exact parcel.
Which municipality reviews my sign permit?
The municipality that governs the parcel, not the mailing address. Around Green Bay, nearby jurisdictions include Ashwaubenon, Allouez, Bellevue, De Pere, Howard, and each administers its own sign approvals.